Total acquires 2.2 GW of solar projects in Texas
Total has acquired 2.2 GW of solar project pipeline along with 600 MW of battery storage projects, all of which are located in the state of Texas in the United States. The projects include four large-scale solar projects, each with co-located battery energy storage systems. These are located in industrial areas close to Houston that have high demand for electricity.
Read More