Innergex and MMBC reach financial close for 102 MW wind project in Canada
Innergex Renewable Energy (Innergex) and Mi’gmawei Mawiomi Business Corporation (MMBC) have reached financial close for the construction and operation of the Mesgi’g Ugju’s’n 2 wind project in Quebec. The wind project has a capacity of 102 MW. The wind project is located in MRC d’Avignon and is an extension of the existing 150 MW Mesgi’g Ugju’s’n wind facility, which was commissioned in 2016. The project is expected to be commissioned in 2026.
Read More